    I’ve just wrapped up my permit‑ready plans for a multi‑level addition, but I’m anxious that hidden collisions between beams, ducts, and pipework could grind the build to a halt. How can I uncover these clashes and code issues before crews mobilize?

    • This topic was modified 4 days, 19 hours ago by toby.daxon.
    #19387
    emry.canon
    Participant

    I avoided a headache by scheduling a mid‑design constructability Review. The specialist team ran a 3D clash detection pass, pinpointed where HVAC trunks intersected structural members, and highlighted fire‑stop clearance gaps. They delivered annotated plans with practical rerouting suggestions and a coordination log that mapped trades’ work zones. Incorporating their fixes into the final drawings meant the permit office raised no red flags and my contractors followed a collision‑free playbook keeping the project on time and sparing me costly on‑site fixes.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.